Project Gallery

This K- 5th grade school is located in Fabius, NY which is 25 minutes southeast of Syracuse. There have been

  The client and architect had a goal of getting as much natural lighting into this building as possible. Daylight

  The client and architect had a goal of getting as much natural lighting into this building as possible. Daylight

The following products were installed by BR Johnson on this brand new funeral home. Ceco HM frames and doors ABS

The storefront, windows, and standard medium stile aluminum doors were supplied by Kawneer and installed by BR Johnson. Six double

This Modernfold Acousti-Seal Encore Paired Panel operable partition created design flexibility for this brand new funeral home. The high STC

There was quite the mix of products on this project. The Kalwall translucent panel system was installed in the clerestory

G and C Foods renovated some existing office space into a Client Engagement Center. This flexible space is used to

Glens Falls National Bank renovated their headquarters in Glens Falls. This Skyfold Premium Zenith wall was installed in the bankโ€™s

The massive renovation of this building included the addition of 2 Modernfold Legacy Acousti-Seal paired panel partitions. They are located

Contact Us

  • Name
Scroll to Top